Hi, I’m Kun J.
I am making a mobile robot layout, but I can’t control the path properly, causing the layout to stop and the mobile robots to collide, so I would like to ask you if you have any good opinions.Thank you (4.7 MB)
1 Like
You need to use control path like , milk,step ,force from work control process and assign the route you want
Hi!
Did You find a way to solve this? Appreciate if you could share some tips with me.
Hi!
Could you explain more?
Hi,
This is almost 2 years old, and he was using the older Works library, we are currently on Process Modelling. You can find more about it here:
If you want more detailed paths using PM + AGV, you can check the new feature called “Missions” (4.7 and onwards)
br,
Lefa