Kanban Note

Hello,

Is it possible to link several components with the Kanban note?
I have several storage racks and would like to track the percentage utilization, this is not possible with normal statistics, I can only display the current number of parts that are in the warehouse.
But I have to divide these by the total number of rack locations and multiply by 100 to get the percentage value.
I wanted to do this using Kanban and display all my 10 shelves.
Unfortunately, I can only select one there and the calculation also fails.
In my screenshot, there are currently 13 parts and 140 spaces available in B1, so normally 9.285% should be displayed

Many thanks

Hello,
You should be able to select several different components. You can enter a different name and select a component, and each time you click on “Add” it will add it to your Variables list.

If the calculation is not updating, you can try reducing the statistics interval:
grafik

2 Likes

oh many thanks :slight_smile: exactly what im looking for.
can you please show me your names and propertys in the kanban.
unfortunately hidden in your screenshot on the right.


Once you’ve clicked on “Add”, you can change the name, component selection and property. They will still be saved in the variable list.

2 Likes

Yes, I did it, it works perfectly. Thank you very much.

But one more question is it also possible to display more decimal places? e.g. 0.15% etc.

in addition to the vc team, it would be great if this function were possible directly in the statistics window. there are certainly several more who would like to have this function in the area of warehouse management analysis i think.

Thank you