How to control flow between multiple PM Nodes

Hi to all, Is there any way how to set /control flow of the material when I have one output place/node connected to many others?

I have a process, where on “Process #5” node are parts collected (buffered) and once there are all parts in they are released to the next process. But I’d like to have control where they are going to. I need a complete batch in one place, and the next batch in another place.

Thank you in advance for your help.

Make an assembly and transport that as a single product once its ready.

Thanks, but I need to transport these products by forklift (to see how many forklifts I need in total), and it can’t transport all of them in one round.

Any other thoughts? Some ID control?