How to add a break/stop between work shifts?

I want my simulation to have 3 work shifts during the day. Therefore, I want to add a break of 30 minutes within each work shift and also add a stop after a work shift ends. How can I do this while making sure that work-in-progress (WIP) parts are not affected? For example: if the break should start after 3.5 hours after the simulation begins, a part that is being glued or processed should not stop abruptly.

Please help with me this.

Thanks in advance :slight_smile: