Hello Community,
I want to ask your advice on the proper way of Assembly dismantlement at the Buffer and statistics presentation.
The right process sequence should be following:
- The KLT red box delivers product block to the double level station.
- The Product block is removed from the KLT box at the bottom level (hypothetically by human - buffer process time will be adjusted) and the KLT placed on the top level for removal.
- Statistics must show exact number of products on the bottom level.
How can the pre-entry process node No.1 be eliminated (applied only for managing the material flow purpose), because the statistics does not count the pre-entry quantity on the bottom level.
If there are 3 products at the bottom level, so the statistics single chart shall show 3 products at that time.
A simpler solution is appreciated ASAP.
The case file is attached.
BR
Dalas
STATION_BUFFER.vcmx (1.3 MB)