# How to add a break/stop between work shifts?

**URL:** <https://forum.visualcomponents.com/t/how-to-add-a-break-stop-between-work-shifts/3128>\
**Category:** General Questions\
**Created:** [November 11, 2021, 1:17pm UTC](https://forum.visualcomponents.com/t/how-to-add-a-break-stop-between-work-shifts/3128 "2021-11-11T13:17:20Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![kaykhattar](https://forum.visualcomponents.com/letter_avatar_proxy/v4/letter/k/2acd7d/32.png) [@kaykhattar](https://forum.visualcomponents.com/u/kaykhattar)\
**Post date:** [November 11, 2021, 1:17pm UTC](https://forum.visualcomponents.com/t/how-to-add-a-break-stop-between-work-shifts/3128/1 "2021-11-11T13:17:20Z")

</div>

I want my simulation to have 3 work shifts during the day. Therefore, I want to add a break of 30 minutes within each work shift and also add a stop after a work shift ends. How can I do this while making sure that work-in-progress (WIP) parts are not affected? For example: if the break should start after 3.5 hours after the simulation begins, a part that is being glued or processed should not stop abruptly.

Please help with me this.

Thanks in advance 🙂
