# Execute Multiple RunRobotRoutine in parallel 

**URL:** <https://forum.visualcomponents.com/t/execute-multiple-runrobotroutine-in-parallel/7128>\
**Category:** Process Modeling\
**Created:** [September 12, 2024, 7:40am UTC](https://forum.visualcomponents.com/t/execute-multiple-runrobotroutine-in-parallel/7128 "2024-09-12T07:40:49Z")\
**Posts on this page:** 3\
**Page:** 1

<div class="post-metadata">

**Author:** ![RobotAusten](https://forum.visualcomponents.com/letter_avatar_proxy/v4/letter/r/5e9695/32.png) [@RobotAusten](https://forum.visualcomponents.com/u/RobotAusten)\
**Post date:** [September 12, 2024, 7:40am UTC](https://forum.visualcomponents.com/t/execute-multiple-runrobotroutine-in-parallel/7128/1 "2024-09-12T07:40:49Z")

</div>

I have a number of identical of cells that each have a single process statement. All of the Cells are in parallel within my flow steps and are each fed a single product.  
 ![image](https://forum.visualcomponents.com/uploads/default/original/2X/a/af7973a8fbd88525312c16965faa1f7fe3cf8d01.png)

Inside of each Process Executor, I have multiple Robots that I want to execute at the same time. If I put both RunRobotRoutines inside the ProcessExecutor, they run sequentially. How to I get them to execute in parallel? I thought about adding a new Process Routine inside the executor, but Im unsure how it will be handled with all the other cells containing other process routines.

![image](https://forum.visualcomponents.com/uploads/default/original/2X/5/542bf117b7ad0547aade0562c757e6bf22cbe6b3.png)

---

<div class="post-metadata">

**Author:** ![TSy](https://forum.visualcomponents.com/user_avatar/forum.visualcomponents.com/tsy/32/761_2.png) [@TSy](https://forum.visualcomponents.com/u/TSy)\
**Post date:** [September 12, 2024, 8:29am UTC](https://forum.visualcomponents.com/t/execute-multiple-runrobotroutine-in-parallel/7128/2 "2024-09-12T08:29:41Z")

</div>

Can’t be done with RunRobotRoutine statement nor by having multiple process implementations in same process executor.

You would need to do something like have the robots wait for a signal and then send that signal from the process, then wait for another signal from each robot when they are done.

---

<div class="post-metadata">

**Author:** ![RobotAusten](https://forum.visualcomponents.com/letter_avatar_proxy/v4/letter/r/5e9695/32.png) [@RobotAusten](https://forum.visualcomponents.com/u/RobotAusten)\
**Post date:** [September 12, 2024, 2:23pm UTC](https://forum.visualcomponents.com/t/execute-multiple-runrobotroutine-in-parallel/7128/3 "2024-09-12T14:23:11Z")

</div>

Thanks, I was able to get this completed, with a single robot in the Process Executor, and connected the other robot with some signals.